A 100 ft × 200 ft Pre-Engineered Building (PEB) shed developed as part of the Nazir Feed Mill Industries project. Delivered on a turnkey basis by Rizwan Nazir Consulting Engineers, the project included structural design, fabrication, erection, and construction supervision, providing a durable and efficient industrial facility for feed mill operations.
• Structural Design
• Fabrication Drawings
• Fabrication
Partner with Rizwan Nazir Consulting Engineers for reliable structural solutions.